Application to Utilize the County Road Right of Way
Read our Right of Way Policy before completing this application. After completing the application, click the submit button. If you have questions that cannot be answered in the policy or on this form contact Peg Matheny, Administrator of Technical Services. At present, there is no charge for the permit.
Today's Date
Application by: (Property Owner, Utility Co. or Hauler) Your name if Applicant is Utility or Hauler Mailing Address: Street/Box City State Zip
Daytime Phone
Describe proposed work in County Road right of way:
Any proposed driveway end treatment will be Gravel or Asphalt Concrete driveway ends are not permitted within the right of way.
Open cuts of County Road pavement are prohibited.
Work location address: If work location address is not available, describe location as follows:
Work will commence on or about and require days to complete.
Select Work Type: Residential Drive Field Drive Service Station Subdivision Street Other Commercial Drive Ditch Enclosure Buried Cable-Telephone Buried Cable-Electric Pole Line-Telephone Pole Line-Electric Tree Trim Tree Removal Spraying Cut Down High Bank Field Drainage Overweight Crossing Oversize Movement Gas Line Crossing Gas Line Parallel Road-Push Bore Treated Sanitary Drainage Other You must select at least one item. Multiple selections are possible by holding down the "Ctrl" key.
Describe type if you selected: Treated Sanitary Drainage Other
Additional information required for the following types of installations: